Position for GM’s highlight : To be sent by 2nd/ 3rd of every month

 

  1. Signaling works
  2.  

Items

07-08

08-09 till last month

Commissioned during the month

Details

EI

 

 

 

 

PI

 

 

 

 

RRI

 

 

 

 

Auto Signalling

 

 

 

 

IBS

 

 

 

 

RRI alteration

 

 

 

 

PI/EI alteration

 

 

 

 

LC gate

Interlocking

 

 

 

 

BPAC

 

 

 

 

Track circuiting

 

 

 

 

FM-FM

 

 

 

 

FM-BSL

 

 

 

 

Loop Line

 

 

 

 

AFTC

 

 

 

 

MS DAC

 

 

 

 

SS DAC

 

 

 

 

IPS

 

 

 

 

Data logger

 

 

 

 

ELB

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B. Joint Works with Engineering .

 

 

07-08

08-09 till

Commissioned during the month

Details

 

 

 

 

C. Telecom Works

 

 

07-08

08-09 till last month

Commissioned during the month

Details

OFC

 

 

 

 

Quad Cable

 

 

 

 

UTS

 

 

 

 

VSAT (No. of terminal)

 

 

 

 

 

Internal Progress position for CAO

 

KFW

 

 

07-08

08-09 till last month

Commissioned during the month

Details

Cable

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MTRC

 

 

07-08

08-09 till  last month

Commissioned during the month

Details

Tower Foundation

 

 

 

 

Tower Erection

 

 

 

 

Pre Feb Erection